It was used for the first time since it was built a year ago.
The "effective" airport cost £285 million, though it is located on a windy hilltop with almost zero possibility to land.
It was used for the first time since it was built a year ago.
The "effective" airport cost £285 million, though it is located on a windy hilltop with almost zero possibility to land.